Restumping prices on the Gold Coast

This site does not set or quote prices. What can be checked before a quote arrives is what moves the cost, the fee the City of Gold Coast lists for defined flood level information, and the Queensland regulator's thresholds for licences, contracts, deposits and warranty cover.

Call (07) 5638 5808

Restumping rules by job value

Type the job's value and the rules that apply to it are highlighted. Each is the Queensland regulator's or the City of Gold Coast's own line, with the page it comes from and the date it was read, and every rule is listed below whether or not you type anything.

Queensland and City of Gold Coast rules for a restumping or house raising job
RuleApplies when the job is valued atSource
The contractor must hold a QBCC licence for building work valued over A$3,300. Ask to see it before you sign or hand over money.About restumpingover A$3,300QBCC, Who must hold a QBCC licence · read
Home warranty insurance is compulsory for residential construction work valued at more than A$3,300, counting materials, labour and GST.About restumpingover A$3,300QBCC, What is home warranty insurance · read
The contract must be written, dated and signed by both parties before work begins. The regulator says a contract is not required for work valued at less than A$3,300.About restumpingA$3,300 or moreQBCC, Contracts and agreement types · read
The maximum deposit is 20%.About restumpingA$3,300 or lessQBCC, Deposits and progress payments · read
The maximum deposit is 10% of the contract price.About restumpingmore than A$3,300 and less than A$20,000Queensland Building and Construction Commission Act 1991, schedule 1B section 33 · read
Queensland Building and Construction Commission Regulation 2018 section 45 · read
The maximum deposit is 5% of the contract price.About restumpingA$20,000 or moreQueensland Building and Construction Commission Act 1991, schedule 1B section 33 · read
Queensland Building and Construction Commission Regulation 2018 section 45 · read
The contract must include advice about your right to a cooling-off period. You can generally withdraw within five business days; withdrawing usually costs A$100 plus the contractor's reasonable out-of-pocket expenses.About restumpingover A$3,300QBCC, Cooling-off period · read
QBCC, Cooling-off period · read
The cooling-off period starts only once you also hold a copy of the QBCC Consumer Building Guide.About restumpingA$20,000 or moreQBCC, Cooling-off period · read
The City lists defined flood level information at A$113.00 for each property lot. Get it before a raise is quoted: the floor height is measured from that level.About restumpingany job valueCity of Gold Coast, Register of Fees and Charges 2026-27, page 10 · read
The City requires habitable floors at or above the defined flood level plus a minimum freeboard of 300 millimetres, as its Flood Overlay Code prescribes.Rests on the City Plan (version 13, read 25 Sep 2026). Version 14 commences 29 Sep 2026; this line will be re-read against it.About restumpingany job valueCity of Gold Coast, Flood level search · read

This lists each source's own lines as read; it is not legal advice, and it sets no price. The value that counts is the value of the building work, including materials, labour and GST.

What moves the cost of restumping and house raising on the Gold Coast

The ground and the water around the house come first. The Queensland regulator says most Queensland homes are built on clay soils, that dry and wet seasons can cause sudden extreme volume changes and soil movement, and that cutting down a well-established tree next to a home could create a subsidence problem. It also says planting a tree next to a building can take up a lot of ground water and cause subsidence when fully grown. What a provider finds under the floor decides the method, and so the quote. A raise adds a height to reach: the City says residential habitable floor levels are to be at or above the combined defined flood level, with minimum freeboard of 300 millimetres, and its register lists defined flood level information at A$113.00 for each property lot for 2026-27. Whether that rule reaches a given job is for the City or a certifier to say.

Before you agree to a price

Ask to see the contractor's licence before you sign or hand over money, since the regulator says a licence is needed for building work valued over A$3,300. It says a domestic building contract must be written, dated and signed by both parties and agreed to before work begins, and that a contract is not required if the work is valued at less than A$3,300. Its maximum deposit is 20% for work valued at A$3,300 or less. Above that, the law caps the deposit at 10% of the contract price below A$20,000 and 5% at A$20,000 or more, and a contractor cannot claim more than 50% of the contract price, including the deposit, until at least half the work on site is done. You generally have five business days to withdraw from a contract, and the regulator says that usually costs A$100 plus the contractor's reasonable out-of-pocket expenses.

Costs and fees by service

No price is shown for any service on this site, and this site sets none. The dollar amounts on this page are the City's fee for a flood level search and the Queensland regulator's thresholds: the licence and warranty line, the written-contract line and the deposit limits. Each was read on 25 September 2026 and is listed with its source at the foot of the page.