Restumping prices on the Gold Coast
This site does not set or quote prices. What can be checked before a quote arrives is what moves the cost, the fee the City of Gold Coast lists for defined flood level information, and the Queensland regulator's thresholds for licences, contracts, deposits and warranty cover.
Call (07) 5638 5808Restumping rules by job value
Type the job's value and the rules that apply to it are highlighted. Each is the Queensland regulator's or the City of Gold Coast's own line, with the page it comes from and the date it was read, and every rule is listed below whether or not you type anything.
| Rule | Applies when the job is valued at | Source |
|---|---|---|
| The contractor must hold a QBCC licence for building work valued over A$3,300. Ask to see it before you sign or hand over money.About restumping | over A$3,300 | QBCC, Who must hold a QBCC licence · read |
| Home warranty insurance is compulsory for residential construction work valued at more than A$3,300, counting materials, labour and GST.About restumping | over A$3,300 | QBCC, What is home warranty insurance · read |
| The contract must be written, dated and signed by both parties before work begins. The regulator says a contract is not required for work valued at less than A$3,300.About restumping | A$3,300 or more | QBCC, Contracts and agreement types · read |
| The maximum deposit is 20%.About restumping | A$3,300 or less | QBCC, Deposits and progress payments · read |
| The maximum deposit is 10% of the contract price.About restumping | more than A$3,300 and less than A$20,000 | Queensland Building and Construction Commission Act 1991, schedule 1B section 33 · read Queensland Building and Construction Commission Regulation 2018 section 45 · read |
| The maximum deposit is 5% of the contract price.About restumping | A$20,000 or more | Queensland Building and Construction Commission Act 1991, schedule 1B section 33 · read Queensland Building and Construction Commission Regulation 2018 section 45 · read |
| The contract must include advice about your right to a cooling-off period. You can generally withdraw within five business days; withdrawing usually costs A$100 plus the contractor's reasonable out-of-pocket expenses.About restumping | over A$3,300 | QBCC, Cooling-off period · read QBCC, Cooling-off period · read |
| The cooling-off period starts only once you also hold a copy of the QBCC Consumer Building Guide.About restumping | A$20,000 or more | QBCC, Cooling-off period · read |
| The City lists defined flood level information at A$113.00 for each property lot. Get it before a raise is quoted: the floor height is measured from that level.About restumping | any job value | City of Gold Coast, Register of Fees and Charges 2026-27, page 10 · read |
| The City requires habitable floors at or above the defined flood level plus a minimum freeboard of 300 millimetres, as its Flood Overlay Code prescribes.Rests on the City Plan (version 13, read 25 Sep 2026). Version 14 commences 29 Sep 2026; this line will be re-read against it.About restumping | any job value | City of Gold Coast, Flood level search · read |
This fills in the enquiry form below; nothing is sent until you submit it. Your details are handled under this site's Privacy Policy.
This lists each source's own lines as read; it is not legal advice, and it sets no price. The value that counts is the value of the building work, including materials, labour and GST.
What moves the cost of restumping and house raising on the Gold Coast
The ground and the water around the house come first. The Queensland regulator says most Queensland homes are built on clay soils, that dry and wet seasons can cause sudden extreme volume changes and soil movement, and that cutting down a well-established tree next to a home could create a subsidence problem. It also says planting a tree next to a building can take up a lot of ground water and cause subsidence when fully grown. What a provider finds under the floor decides the method, and so the quote. A raise adds a height to reach: the City says residential habitable floor levels are to be at or above the combined defined flood level, with minimum freeboard of 300 millimetres, and its register lists defined flood level information at A$113.00 for each property lot for 2026-27. Whether that rule reaches a given job is for the City or a certifier to say.
Before you agree to a price
Ask to see the contractor's licence before you sign or hand over money, since the regulator says a licence is needed for building work valued over A$3,300. It says a domestic building contract must be written, dated and signed by both parties and agreed to before work begins, and that a contract is not required if the work is valued at less than A$3,300. Its maximum deposit is 20% for work valued at A$3,300 or less. Above that, the law caps the deposit at 10% of the contract price below A$20,000 and 5% at A$20,000 or more, and a contractor cannot claim more than 50% of the contract price, including the deposit, until at least half the work on site is done. You generally have five business days to withdraw from a contract, and the regulator says that usually costs A$100 plus the contractor's reasonable out-of-pocket expenses.
Costs and fees by service
No price is shown for any service on this site, and this site sets none. The dollar amounts on this page are the City's fee for a flood level search and the Queensland regulator's thresholds: the licence and warranty line, the written-contract line and the deposit limits. Each was read on 25 September 2026 and is listed with its source at the foot of the page.