Raising in Nerang: what the flood record and council rules mean for your floor height

By Artigellence ·

If you are weighing up a raise in Nerang, start with flood levels, not the builder's quote. The Bureau of Meteorology lists 10.22 m as the highest Nerang River level on record, and City of Gold Coast says habitable floors should sit at or above the defined flood level plus 300 millimetres of freeboard. Raising is building work, so approvals need to line up before anything is lifted.

Call (07) 5638 5808
The open space beneath a raised timber floor, square timber posts standing on bare ground under the bearers and joists — house raising, Gold Coast. Illustrative example.

What the Nerang River record shows

The Bureau of Meteorology publishes a flood brochure for the Nerang River, and its numbers are a good reality check before you plan a raise. At the Clearview gauge the river reached 5.63 m on 31 March 2017. The highest level on record there is 10.22 m, from January 1974. A recent flood, in other words, is not the ceiling for what the river has done.

So the height of a flood on the day depends on more than the rain that fell upstream.

These readings describe the river at a gauge. They are not a floor height for your house, and they should not be treated as one. For that you need the figure for your own lot.

What the council expects of floor levels

City of Gold Coast says residential habitable floor levels need to be at or above the combined defined flood level, plus a minimum freeboard of 300 millimetres. That requirement is set out in the Flood Overlay Code of the City Plan. Freeboard is simply the margin you keep above the flood level, so a raise that only just clears the line is not enough.

The council describes its Designated Flood Level as reflecting a rain event with at least a one per cent chance of occurring in any given year, and for most areas that event coincides with a storm-tide. It is a planning benchmark, and the 1974 reading above is a separate thing.

The council also runs a flood level search that provides defined flood information for each property lot, and it says an administrative fee is payable for the search. Getting that information early tells you how far the floor may need to go up, which shapes everything else about the job.

Raising is building work, so approvals come first

The Building Act 1975 (Qld) counts building, repairing, altering, underpinning and moving a building as building work. The same Act says all building work is assessable development unless it is accepted development under section 21(2) or under a regulation made under the Planning Act. Do not assume a lift falls outside that.

Schedule 1 of the Building Regulation 2021 also contains a provision that does not apply to repairs, maintenance or alterations that change a building's floor area or height. A raise changes height, so ask your certifier how that provision treats your particular job.

If you use a private certifier, City of Gold Coast says they cannot issue an approval until the other approvals, such as town planning approval from the council, have been given. The council then receives a copy of the approval and the final inspection documents within five business days of issue. Allow for that order of events when you plan dates.

Before you sign a contract

The QBCC says building contracts above a set value must include advice about your right to a cooling-off period. It starts the day after you receive a signed copy of the entire contract, including any plans and specifications. Use those days to check that the floor height in the paperwork matches the flood information you collected for your lot.

A sensible order for a Nerang householder is to get the lot's flood information, confirm the approvals pathway with a certifier, and only then compare quotes on the same target floor level. Quotes built on different heights are not comparable.

Artigellence is the marketing business that operates this site and writes its articles. It does not carry out the work described.

House raising Gold Coast

Call (07) 5638 5808

Request a free quote

Last reviewed · Updated · First published