House stumps Gold Coast: what to check before you book work
By Artigellence ·
Before you settle on a plan for your house stumps on the Gold Coast, find out your lot's defined flood level. City of Gold Coast says habitable floor levels must sit at or above that level plus a minimum freeboard of 300 millimetres. Heritage listing and the building certifier process can also change how and when the work goes ahead.
Call (07) 5638 5808
Start with the flood level for your lot
The first number worth knowing is not about the stumps at all. City of Gold Coast says it requires residential habitable floor levels to be at or above the combined defined flood level, with a minimum freeboard of 300 millimetres on top. If your floor sits close to that line, any plan that changes the height of the house needs to be judged against it.
You can get a flood level search report for a property. The City charges an administrative fee for the search and for sending the results, and its 2026-27 fees register lists $113.00 for Defined Flood Information for each property lot.
The defined level reflects a rain event with at least a one per cent chance of happening in any year (1% AEP), coinciding with a storm-tide for most areas. That is a planning benchmark, not a forecast.
What the flood search will not tell you
The report has limits, and it pays to know them before relying on it. The City says the results refer to riverine or regional flooding only and do not cover local flash flooding. The search also does not show the flood extent for your property.
The City also recommends owners engage a licensed surveyor to determine accurate property and floor levels. If your plan depends on a few hundred millimetres either way, a surveyed floor level is a better starting point than a guess.
Heritage and planning checks
Some older Gold Coast homes are on the Gold Coast Local Heritage Register, which is where places recognised for their cultural heritage significance are entered. City Plan's heritage overlay table separately lists building work that involves complete or partial demolition, relocation or removal of a local heritage place, so it is worth checking whether your house is listed before anything is booked.
City of Gold Coast says its interactive mapping and City Plan will help you work out whether you need to lodge a development application. If your home is in Southport, note that the Southport priority development area covers 198.3 hectares, and the City says its development scheme applies to all development on land within that boundary. Check the mapping for your street rather than assuming either way.
Approvals, certifiers and the final certificate
The City says Queensland building approvals are issued by private building certifiers, not Council. It also says a private certifier cannot issue an approval until the other approvals, such as town planning approval from the council, have been given. In practice that means any planning question needs an answer before the building approval can move.
Not every job needs an approval. The City says minor repairs or maintenance that do not affect the structural or fire safety of a building may not need building approval. Whether your job falls on that side is a question to put to a certifier or to the City, rather than something to assume.
Once the work is finished, do not skip the last step. The City says the final certificate is important to avoid resale and insurance issues, and that a final inspection is not automatic and must be requested. Keep that in mind when you compare quotes and ask who handles it.
Artigellence is the marketing business that operates this site and writes its articles. It does not carry out the work described.
Thanks — we have your enquiry. Someone will be in touch shortly. Prefer to talk now? Call (07) 5638 5808.
Last reviewed · Updated · First published